2024/09/10 10:17

This tea room can be assembled by two women in an hour while watching DIY videos on YouTube.^^
If you watch it on the YouTube website (app), subtitles are available in English, Chinese, and Arabic.



0:00 Explanation of parts 0:15 Drive iron pins into the thresholds(Shikii) 0:25 Installing the base: Arrange the thresholds(Shikii) and combine them with the pillars. At this time, make sure that the pillars are facing the correct top and bottom (up or down). 1:00 Securing the threshold and pillars: Before assembling the ceiling, drive iron pins into the threshold and secure the pillars. 1:12 Ceiling (kamoi) installation: The ceiling posts are assembled on top of the existing posts. Similar to the threshold, iron pins are driven in beforehand before installation. 2:05 Traditional Japanese underfloor installation: Pillars (flooring material) are laid out to be placed under the tatami mats. 2:45 Laying the tatami mats: Lay the tatami mats. The key here is to position them so that the weave of the mats is offset by 90 degrees. 3:15 Traditional Japanese walls: Installation of sliding doors (fusuma) 3:50 Traditional Japanese doors: Installation of shoji screens 4:12 The beauty of the shadows cast by shoji screens 4:20 Looking at the living room from the tea room is like looking at a Japanese garden. 4:39 Japanese Zen Tea ceremony 1.Ojigi(bow) 2.Samurai meditation 3.drink green tea 4. Wabi-sabi medetation 5.Ojigi(bow) Preparation before assembly: 1. Check the parts: Check that all the parts that arrived are present. 2. Ensure safety: Work in a place where there are no children. * Number of workers: Installation is possible with one adult in under two hours, but for safety reasons, it is recommended to have at least two adults working whenever possible. Ceiling: The ceiling is open, so you can use the living room's air conditioning as is. However, please refrain from hanging from the pillars in the ceiling. Maintenance: If you lay carpet under the floor, please use a non-slip mat in conjunction with it.



0:00 概要 1:08 部材の説明 2:02 柱の組み立て 3:50 組み立てた柱をボルトで固定 4:35 畳の下の柱を敷きます 6:05 畳を乗せます 7:55 襖(ふすま)をセット 9:50 障子をセット


Preparation before assembly:
1. Check the parts: Check that all the parts that arrived are present.
2. Ensure safety: Work in a place where there are no children.


Assembly Procedure
1. Preparing the Thresholds: Drive iron pins into the four thresholds.
2. Installing the Base: Arrange the thresholds and combine them with the pillars. At this time, make sure the top and bottom (upward/downward) of the pillars are correct.
The orientation of the pillars can be confirmed by the metal fittings at the joints.
The bottom of the pillars is coated with rubber, so there is no need to worry about damaging the living room floor.
3. Securing the Pillars: Drive iron pins into the thresholds to secure the pillars.
4. Installing the Lintels: Combine the lintels on top of the pillars. As with the thresholds, drive iron pins in beforehand before attaching.
5. Securing the Lintels: Drive iron pins in to secure the lintels to the pillars.
6. Installing the Underfloor: Arrange the pillars (flooring material) to be laid under the tatami mats.
7. Laying the Tatami Mats: Lay the tatami mats. At this time, the key is to arrange them so that the grain of the tatami mats is offset by 90 degrees.
8. Installing the Doors and Windows: Finally, install the sliding doors (fusuma) and then the shoji screens (shoji) to complete the assembly.

*Number of workers: Installation can be done by one adult in under two hours, but for safety reasons, it is recommended to have two or more adults working together whenever possible.
Ceiling: The ceiling is open, so you can use the living room's air conditioning as is. However, please refrain from hanging from the ceiling pillars.
Maintenance: If you lay carpet under the floor, please use a non-slip mat in conjunction with it.

:組み立て前の準備 1.部材の確認: 届いた部材が揃っているか確認します 2.安全の確保: お子様がいない場所で作業を行ってください :組み立て手順 1.敷居(しきい)の準備: 4本の敷居に鉄ピンを打ち込みます 2.土台の設置: 敷居を並べ、柱と組み合わせます。この際、柱の上下(上向き・下向き)を正しく確認してください
柱の向きはジョイント部分の金具で確認します 敷居の底にはゴムがコーティングされているため、リビングの床を傷つける心配はありません 3.柱の固定: 鉄ピンを敷居に打ち込み、柱を固定します 4.鴨居(かもい)の設置: 柱の上に鴨居を組み合わせていきます。敷居と同様に、あらかじめ鉄ピンを打ち込んでから取り付けま 5.鴨居の固定: 鉄ピンを打ち込み、鴨居を柱に固定します 6.床下の設置: 畳の下に敷くための柱(床材)を並べます 7.畳を敷く: 畳を敷いていきます。このとき、畳の目を90度ずつずらすように配置するのがポイントです 8.建具の取り付け: 最後に襖(ふすま)を組み込み、続けて障子(しょうじ)を取り付ければ完成です ※ 作業人数: 大人1名でも2時間以内での設置が可能ですが、安全のため可能な限り大人2名以上での作業が推奨されています 天井: 天井は空いている構造のため、リビングの空調をそのまま利用できます。なお、天井の柱にぶら下がるなどの行為は控えてください メンテナンス: 床下にカーペットを敷く場合は、滑り止めマットを併用してください